Every year the Borough has spring clean up in several parks. |
|
|
|
|
|
|
|
|
|
|
|
|
CMTA and friends gather for the clean up |
|
|
|
|
|
|
|
|
|
|
|
|
Warren Templin of the Parks & Rec goes over job assignments & safety. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nothing like a BBQ after a hard clean up day. |
|
|
|
|
|
|
|
|
|
|
|
|
Trail prep for installing Geo Board. |
|
|
|
|
|
|
|
|
|
|
|
|
The Geo Board is assembled in sections and laid down and fastened. |
|
|
|
|
|
|
|
|
|
|
|
|
As the sections are put together the board is covered with dirt and compacted. |
|
|
|
|
|
|
|
|
|
|
|
|
The hard work pays off with keeping erosion to a minimum |
|
|
|
|
|
|
|
|
|
|
|
|
With a grant from the borough bed tax, the Pavilion work started 04/19/08. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The trusses were completed in a day and when ground conditions are good we'll start at the Crevasse. |
|
|
|
|
|
|
|
|
|
|
|
|
Warren showing the students from Job Corp the finer points of using an electronic transit. 05/31/08 |
|
|
|
|
|
|
|
|
|
|
|
|
Pouring concrete into the sauna tubes. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adding more gravel fill for the Pavillion base. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Doing a little trail maintenance while we're at it. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Truss work begins. 6/7/08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Truss and Roof work 06/14/08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A little lunch and a break from the rain. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Saturday 06/21/08 work continuing rain or shine. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Last Day 6/28-08 A little conversation and lunch break |
|
|
|
|
|
|
|
|
|
|
|
|
|
Warren and Michael starting the metal roof. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Besides some gravel fill around the anchor tubes and some trim, this is a done deal! |
|
|
|
|
|
|
|
|
|
|
|
|
To all the folks that helped with this project, your help has been a valuable contribution that put this thing together. Thanks a bunch and hope to see you at the Crevasse |
|
|
|
|
|
|
|